Rancilio CLASSE 10 Instruction Manual Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 41
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
74
(OHFWULFVXSSO\
7KHPDFKLQHLVVXSSOLHGUHDG\IRUFRQQHFWLRQ
DFFRUGLQJWRWKHUHTXLUHGHOHFWULFDOVSHFL¿FDWLRQV
Before connecting the machine ensure that the plate
GHWDLOVFRPSO\ZLWKWKRVHRIWKHHOHFWULFGLVWULEXWLRQ
network.
7KH HOHFWULFDO FRQQHFWLRQ FDEOH PXVW EH GLUHFWO\
connected to the connection provided according to
FXUUHQWOHJLVODWLRQ(QVXUHWKDWWKHHDUWKLQJV\VWHP
LVHI¿FLHQWDQGLQFRPSOLDQFHZLWKFXUUHQWOHJDOUH-
quirements.
7KHHDUWKLQJV\VWHPDQG WKH OLJKWHQLQJ SURWHFWLRQ
V\VWHP PXVW EH UHDOL]HG LQ DFFRUGDQFH ZLWK WKH
provisions of current legislation.
)RUWKHVXSSO\QHWZRUNXVHDFDEOHLQFRPSOLDQFHZLWK
standards with protective conductor (earthing wire).
For three-phase power use a cable with 5 conductors
( 3 phases + neutral + earth).
)RUVLQJOHSKDVHSRZHUVXSSO\XVHDFDEOHZLWK
conductors (phase + neutral + earth).
,QERWKFDVHVLWLVQHFHVVDU\WRSURYLGHDQDXWRPDWLF
differential switch ()LJ) at the start of the power
cable, complete with magnetic release elements in
DFFRUGDQFHZLWKWKHLGHQWL¿FDWLRQSODWHGHWDLOV)LJ
1). The contacts must have an opening of equal or
over 3 mm and with dispersed current protection of
30 mA.
5HPHPEHUWKDWHDFKPDFKLQHPXVWEH¿WWHGZLWKLWV
RZQVDIHW\HOHPHQWV
:$51,1*
Should the power supply cable be damaged
it is to be replaced by the manufacturer or by
its technical assistance service or by person
ZLWKHTXLYDOHQWTXDOL¿FDWLRQLQRUGHUWRSUH-
YHQWDQ\ULVNV
3UHOLPLQDU\RSHUDWLRQV(Fig.7)
P O T E N T I A L - E Q U A L I Z I N G
CONNECTION
7KLVFRQQHFWLRQZKLFKLVWKHRQHFDOOHGIRUE\VHYHUDO
norms, avoids electrical potential differences, building
XSEHWZHHQDQ\HTXLSPHQWWKDWPD\EHLQVWDOOHGLQ
the same room. There is a terminal clip on the under
side of the base of the machine to which an external
potential-equalizing wire should be connected.
This connection is ABSOLUTELY NECESSARY and
must be made right after the machine is installed.
Use a wire whose cross-sectional area conforms to
the existing norms.
CONNECTIONS
L Place the machine on the horizontal surface pre-
YLRXVO\SUHSDUHG
%HIRUHFRQQHFWLQJWKRURXJKO\ZDVKWKHPDLQVZDWHU
pipes:
L/HDYHWKHZDWHUVXSSO\WDSVUXQQLQJDWIXOOSUHV-
sure for several minutes.
L&RQQHFWWRWKHPDLQVZDWHUVXSSO\
L Connect the machine to the socket.
L Connect the gas pipe
7KRURXJKO\ZDVKDOOWKHZDWHUSLSHVRIWKHPDFKLQH
L/HDYHWKHZDWHUVXSSO\WDSVUXQQLQJDWIXOOSUHV-
sure.
L Switch on main switch 1 (Fig.8): wait until the boiler
¿OOVXSWRWKHOHYHOVHW
L Boiler resistance switch2 (Fig.8) to begin heating
the water in the boiler.
L Operate each unit in order to allow the water to
HVFDSHIRUDERXWRQHPLQXWHUHSHDWWKHRSHUDWLRQ
twice.
L Deliver steam from the steam jets for about one
minute.
L'HOLYHUKRWZDWHUIRUDERXWRQHPLQXWHUHSHDWWKH
operation twice.
L Switch off switches 1 and 2.
L(PSW\WKHZDWHUIURPWKHERLOHUVHHSRLQW
IMPORTANT
Should the machine not deliver water for over
24 hours, wash the internal components be-
fore beginning work, repeating the operations
DVGHVFULEHGDERYH
Page view 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 40 41

Comments to this Manuals

No comments